Eastside Birmingham

Location: Birmingham, West Midlands
Sector: Public
Contractors: Thomas Vale Construction

Synopsis:

Exterior cladding, curtain walling and ramp barriers for new multi-storey car park within the Birmingham Eastside redevelopment project.

Products installed:

  • 1900sqm of Custom Rainscreen Cladding
  • 450sqm of Expanded Metal Façade
  • 1000sqm of Kingspan KS1000 Wall System
  • Berry Beam Barrier
  • RB1 Posts with Handrail and Mesh
  • 200sqm Curtain Walling
  • 300sqm Rainscreen Cladding
  • 700sqm Acrylic Lightpod Units

Eastside, Birmingham:

The Cardigan Street multi-storey car park is a key element of the Birmingham Eastside redevelopment and has a capacity of 975 cars. Berry Systems won seven of the cladding packages put out to tender by the main contractor Thomas Vale.

Following the original schematic design by Hill Cannon UK and Urban Design, and working closely with Ash & Lacy, we were able to supply and install over 1900sqm of custom rain screen cladding.

It was produced in a 3D geometric layout incorporating a number of blue acrylic ‘lightpod’ sections. These not only provide a colour contrast with the silver anodised clarking cladding, but also allow interior light from the car park to create a stunning effect from the external view.

The main external cladding was completed by the use of expanded metal aluminium screen on the ground floor and the Kingspan wall system to part of two elevations.

Our system delivers superior off-road protection that is tested in accordance with BS EN 1991-1-1. This is to ensure vehicles in car parks have sufficient edge protection.

We also installed our handrail and mesh to increase pedestrian protection, meeting the 1100m height from the finished floor level in line with current building requirements.

Enquiry

    Don’t worry, we will only contact you with regards to your enquiry and your details will be deleted forever after an appropriate period of time. We will never pass on your information to anyone else.

    Yes, I am happy for you to hold my data and send further correspondence.No, please do not send me any future correspondence
    I agree to Berry Systems Privacy and Cookies Policy
    This site is protected by reCAPTCHA