Morrisons
Installation of internal and external safety barriers to protect walkways, loading bays and columns.
DLA Architecture specified over 2.5 km of safety barriers to safeguard people, machinery, and equipment throughout the site. This specification was approved by both the client and the main contractor, Bowmer & Kirkland. Inside the warehouse, more than 1.5 km of barriers were installed, with nearly 1 km added outside the facility.
In total, approximately 800 metres of Berry’s Spring Steel Buffers were used, including a Warehouse Rail installed below the standard barrier rail to protect pedestrian walkways from warehouse vehicles such as forklifts.
The lower rail was specifically designed to prevent forklift forks from penetrating pedestrian walkways, adding an extra layer of safety.
The varied barrier styles used throughout the facility were tailored to address specific risks in different areas, demonstrating the versatility of Berry Systems’ range in providing approved and tested solutions to meet diverse safety needs.
Services Provided
Products used
Share Project


















Luton Airport MSCP

Darlington Train Station MSCP

IKEA Sheffield

Banbury Station

London Heathrow Airport

Co-Operative Warehouse Avonmouth

Southwater Telford

Westfield Shopping Centre

Aggreko

Uppsala Car Park