Berry Systems supplied and installed exterior cladding and split level vehicle barriers for a new multi-storey car park at the centre of the Southwater Regeneration Scheme.
Berry Systems provided exterior cladding and split-level vehicle barriers for a new multi-storey car park at the heart of the Southwater Regeneration Scheme.
A prominent feature of the Southwater Regeneration project in Telford is the development of a 600-space multi-storey car park, with plans to expand by an additional 350 spaces in the future.
Associated Architects of Birmingham engaged with us early in the project to discuss the cladding requirements, allowing us to leverage our expertise to design a cladding system that met pedestrian loading requirements under BS 6180 and eliminated the need for additional pedestrian handrails on interior faces.
The expanded metal mesh cladding was produced and installed by our team for contractor Morgan Sindall. This cladding system not only meets the necessary standards but also contributes to the aesthetic and functional goals of the project.
We installed vehicle safety barriers at the split levels within the car park using our range of floor and column-mounted barrier systems. These barriers ensure robust protection and safety throughout the multi-storey structure.
The installation was completed in April 2014, ahead of the planned August launch event for phase 1 of this £250 million project.
The Southwater regeneration is a collaborative effort between Telford & Wrekin Council, Southwater Event Group, private sector investors, and is partly funded by the Homes & Community Agency.








Luton Airport MSCP

Darlington Train Station MSCP

IKEA Sheffield

Banbury Station

London Heathrow Airport

Co-Operative Warehouse Avonmouth

Westfield Shopping Centre

Aggreko

Uppsala Car Park

Coventry Barracks